The Corps Makes Room for Salmon, 1970
1970
Pages (2) — viewing 1
Description
Printed the same year Little Goose Dam closed the last free stretch of the lower Snake River, this Corps of Engineers pamphlet explains — with diagrams and a photograph of Bonneville's fish ladder — how the agency proposed to keep Pacific salmon alive in a river system it had spent three decades damming.
By 1970 the U.S. Army Corps of Engineers had built a staircase of dams across the Columbia and lower Snake: Bonneville (1938), McNary (1954), The Dalles (1957), Ice Harbor (1962), Lower Monumental (1969), and Little Goose — finished the very year this pamphlet was printed. Each dam required the Corps to confront the same problem: Pacific salmon and steelhead return from the ocean to spawn in the same upriver gravel where they hatched, navigating hundreds of miles against the current. A concrete wall across the river kills the run unless fish can get around it.
The Corps' primary answer was the fish ladder — a stepped series of water-filled pools at the dam's edge, designed so a fish can swim upstream through short bursts of current, resting at each pool. Bonneville, the oldest dam on the system, got the first large-scale ladder in 1937 and became the template for every subsequent project. The cover photograph shows that ladder in operation: a long concrete channel curving around the dam's powerhouse, whitewater churning through its pools.
The interior adds the other half of the equation — fish hatcheries. By 1970 the Corps and its state partners (Oregon and Washington fisheries agencies, the U.S. Fish and Wildlife Service) were intercepting adult females before they could spawn naturally, stripping and fertilizing eggs in controlled tanks, raising the young for up to fifteen months, then releasing them as fingerlings (young fish, roughly one to several inches long). The illustrated diagram contrasts this process against the natural two-to-five-year ocean life cycle side by side — a candid acknowledgment that the hatchery route substitutes for what the dams interrupted.
The pamphlet appeared at a fraught moment. The National Environmental Policy Act had just been signed on January 1, 1970, requiring federal agencies for the first time to assess environmental harm before construction — a law the Columbia-Snake dams had predated by decades. That same year, nitrogen supersaturation in the tailwater below new dams was killing smolts by the tens of thousands, forcing the Corps into emergency barge and truck transport of juvenile fish. The pamphlet's tone is confident and technical, but the fish-passage failures it was responding to were already well known to state fisheries agencies.
Researched with claude-haiku-4-5-20251001 on May 25, 2026. AI-assisted — verify before citing.
Details
- Year
- 1970
- Publisher◇ AI
- U.S. Army Corps of Engineers
- Coverage◇ AI
- Lower Columbia and Snake Rivers, Pacific Northwest, USA
- Paper◇ AI
- uncoated bond
- Print medium◇ AI
- offset lithograph
- Color◇ AI
- two-color
FeaturesAI
- folded pamphlet format
- halftone photograph of Bonneville Dam fish ladder
- illustrated salmon life-cycle diagram
- Corps of Engineers castle insignia printed in spot red
Condition notesAI
- general toning on cover stock
- light edge wear
Highlights
- The cover photograph shows the Bonneville Dam fish ladder as a long concrete bypass channel curving around the dam's powerhouse, with whitewater visible in the stepped pools.p.1
- The Corps of Engineers castle insignia is printed in red — the only use of a second ink color on the cover, standing out against the blue-and-cream title typography.p.1
- The year '1970' is centered at the foot of the cover, placing this pamphlet in the same year Little Goose Dam was completed and emergency smolt-barge transport began on the Snake River.p.1
- The 'Natural Life Cycle' half of the diagram traces salmon from stream hatching through two-to-five years in the Pacific and back upstream to spawn and die — the full circuit the lower-river dams interrupted.p.2
- The label 'DETOUR TO HATCHERY' appears at the top of the hatchery diagram, where the salmon's upstream journey is redirected into a facility — an unusually direct choice of wording for a government public-information piece.p.2
- The body text identifies four partner agencies — Oregon and Washington state fisheries commissions and two divisions of the U.S. Fish and Wildlife Service — as jointly conducting fisheries research on the lower Columbia and Snake.p.2
Further reading
Bonneville Dam — Wikipedia
WikipediaHistory of the first federal dam on the Columbia River, including the design and construction of the fish ladder system that became the model for all subsequent Columbia-Snake projects.
National Environmental Policy Act — Wikipedia
WikipediaSigned January 1, 1970, NEPA required federal agencies to assess environmental impacts before major projects — a requirement the existing Columbia-Snake dams had predated entirely.
Ice Harbor Dam — Wikipedia
WikipediaBackground on the first of four lower Snake River dams completed by the Corps between 1962 and 1975, including fish passage provisions.